Friday, January 26, 2024
Out with the old
Friday, January 5, 2024
Seagulls & mice
We are well aware that we don't always follow convention when it comes to home decor. Nobody has actually told us this to our faces but we have noticed the expressions of horror, quickly hidden away, on the faces of those visiting.
When we started looking online for wallpaper to put up in our living room we were drawn to something we had tried in our previous house, a mural. For a time we considered painting the wall, something exciting, a work of art that might be visible from the street, but in the end we settled for this sunrise and its five seagulls, made to measure from strips of wallpaper. It is both unusual and quite dramatic, something more usually associated with a public space and therefore unexpected in a home setting. We do not follow convention. For the rest of the living room we have gone for plain colours and finally, at 1205 on Wednesday 13th December, we finished fixing the last strip of wallpaper. A big tick, job done.Thursday, December 14, 2023
Solar 'n chill
Not until next spring will we really be able to compare previous with present, gas boiler with electric condenser, but just what are the likely differences?
Friday, November 17, 2023
From kitchen to pond
Describing the steady progress made with tiling our kitchen walls is of no real interest to anyone not directly involved so we will not dwell on it any more here. Hanging over us throughout the whole process is the 'Have we ordered enough tiles?' question, something which any kitchen fitter regularly faces. As it turns out we find ourselves with a whole box left unused, which naturally begs the question, 'Where else can we put them?'
Suddenly, almost overnight, the pond liner started rising, forced upwards by the pressure of the ground water from beneath. How this could be happening in a sloping garden seems to defy logic but the effect of this was that as the plastic liner rose higher the water inside the pond was forced out through the overflow until almost nothing was left. The pond life which had spent the summer months galavanting about above and below the surface were now living in a shallow puddle, if they survived at all. Even large rocks placed into the pond (rocks being heavier than water) failed to counter the pressure from beneath - they too were being lifted up! All this goes to show is how little we know about what is happening beneath our feet. There are forces at work that we could never imagine.
Monday, November 13, 2023
Kitchen distractions
Friday, October 20, 2023
Kitchen refit 3
Another diversion from refit activity took place when these two turned up on our doorstep, complete with enormous rucksacks. Antony and Sally Brown were walking around the whole UK coastline to raise money for the RNLI, our privately run lifeboat charity, and we caught them coming through our village and gave them a bed for the night. They had to manoeuver around the assorted kitchen hardware but this didn't seem to bother them too much.
Surprisingly it turns out that kitchen refitting is a weather dependent activity - who'd have thought it! Too hot and work grinds to a halt but cooler with lots of rain and our preference for staying dry keeps us inside where staring at an unfinished kitchen will always provide the motivation to crack on. So side two begins, destruction first, lay the flooring then reconstruction. For the first time we would find out whether everything fitted. We knew it would be tight, four base units side by side, leaving just enough space for our small dishwasher....
...and it was tight. But as it turned out everything did fit.This is good news. But it is only part of the story because on top of these things we need a worktop, a continuous wall to wall length, just short of three metres long. Careful measuring was required (measure five times, cut once) but despite this, making the cut with a beast of a power saw was as stressful as it gets, but then to know if it fitted we had to carry the massive chunk of worktop up from beneath the house, through the back door and into the kitchen. It then had to be lifted high at one end and manoeuvred between the two plasterboard walls before being gently lowered into place.It fits, just. At a squeeze.
This is not the end, of course, for we must cut an enormous hole in it to fit the new sink, something that must then be connected to pipes which rise up through the floor in the most inaccessible place possible, behind the kitchen units we have just fitted. And all through this process, from the moment we ripped out the old bits from kitchen side two, we had no water, so we had to wash up using the shower and we were filling the kettle from the bathroom sink. The pressure to complete the work dominates our lives, each day requiring different tools to be located, holes cut precisely, screws tightened carefully, and important decisions made on the sequence of moves necessary to achieve success. Connect the plumbing first, turn on the water to check for leaks, then everything had to be disconnected again to secure the sink properly on a bed of messy silicone. The plumbing was made worse by having to connect a new sink to rather aged waste pipes which were of a different size. Years ago someone must have decided that waste pipes needed to be a 1/4 inch bigger so that plumbers could make more money by fitting new pipes in everyone's home. A professional would have known this, of course, and have all the right fittings ready to hand. A mere amateur, however, is faced with having to cannibalise the old sink to recover the right collection of bits. Such is life!
After a full week of a kitchen without water our days of washing up in the shower are finally over. Side two is operational albeit many details are still to be completed. We sit back and relax, to let the stress dissipate.A series of equinoctial gales arrives and the howling noises as these whip past the house are unsettling but thankfully no damage occurs outside. The accompanying rain batters against our windows and drenches the garden (not a new phenomenon in these parts) but this time the pace of internal refit work has slowed, become more relaxed now we have a functioning kitchen again. Our refit project is not done, far from it, but the rest can be finished gradually as time allows, each tiny step taking us closer to our vision of the perfect kitchen.
Perhaps this is the time to recap, to compare what we have made with what we inherited when we bought the house some twelve months ago. Would our vendor recognise this as her kitchen, I wonder. The far end wall needs a lick of paint and tiling will be added elsewhere but strangely the space feels bigger than before, less cluttered and with the brilliant lights in our suspended ceiling we are proud of what we have achieved.Thursday, September 28, 2023
Kitchen refit 2
This stone ringed flower bed emerged into daylight for the first time in decades once the overgrown shrub was hacked back to a few stumps and the meadow that surrounded it was strimmed down. The perfectly cut grass lawn has never been our concept of a nice garden but we do like to know what features lie hidden from us.
They eluded my efforts with the camera however several weeks later we found this beauty lying on the ground beside the pond, the last moments of his life fading away. Dragonflies only live for a few weeks in their adult form.
Sunday, September 17, 2023
Kitchen refit 1
The previous blog entry did rather spoil the surprise didn't it. The only question that remains is how many more episodes will appear here before it is done.
Let us start with the kitchen floor then, which originally looked like this...
Beneath this, however, was the real horror, vinyl tiles stuck down with an adhesive which leaves a sticky residue on the floor boards beneath.
Scraping and peeling these things up proved very physical (as well as being tough on the knees) but the floor's unevenness across the room made it essential so it had to be done. The horrible sticky residue left behind had to be covered over immediately before it grabbed our feet and then spread to the rest of the house so the job was done section by section then covered immediately with a thin layer of plywood.



























